The Bridgeland Mainstreet Project will be installing underground utilities at the 9A Street intersection along the north side of 1 Avenue N.E. To complete this work, a temporary road closure is required. On either May 30 and 31, OR June 1 and 2, 9A Street between 1 Avenue and 2 Avenue N.E. will be closed for construction. Please note that the exact timeline for this work has not yet been finalized; therefore, two sets of dates are provided above. The date will be determined based on scheduling and crew availability.
We kindly ask that you remain vigilant for crews and detour signage during this period.
During the road closure, crews will ensure local-only road access is available along streets impacted by road closures. The temporary street parking restrictions are necessary to ensure sufficient road width is available for detoured vehicle traffic to safely navigate during construction.
While construction is occurring on 1 Avenue N.E., westbound vehicle traffic will be detoured to the side streets and 2 Avenue N.E., to ensure roadway users can travel safely through the area and still access their destinations. Eastbound vehicle traffic will remain unaffected during these stages of work.
Upcoming Electrical Utility Crossing Installations (Spring/Summer):
Please note that the schedule below may be subject to change but we will continue to update our website Calgary.ca/BridgelandMainStreet with up-to-date schedule and project information.
The following streets near 1 Avenue N.E. will see one-day closures to complete important electrical utility crossing installations over the coming spring/summer weeks:
9 Street N.E. (North Crossing) will be closed on June 8, 2024
8A Street N.E. (North Crossing) will be closed on June 9, 2024, and 8A Street N.E. (South Crossing) will be closed on June 29, 2024
8 Street N.E. (North Crossing) will be closed on June 15, 2024
7A Street N.E. (North Crossing) will be closed on June 16, 2024, and 7A Street N.E. (South Crossing) will be closed on July 6, 2024
7 Street N.E. (North Crossing) will be closed on June 22, 2024, and 7 Street N.E. (South Crossing) will be closed on July 7, 2024
6A Street N.E. (North Crossing) will be closed on June 23, 2024, and 6A Street N.E. (South Crossing) will be closed on July 13, 2024
6 Street N.E. (North Crossing) will be closed on June 30, 2024, and 6 Street N.E. (South Crossing) will be closed on July 14, 2024
After the utility work is complete, the traffic detour and parking restrictions will revert to current existing construction closures:
North side of 1 Avenue between 9A Street to 11 Street N.E.
East side of 11 Street between 1 Avenue to 2 Avenue N.E.
North side of 2 Avenue between 9A Street to 11 Street N.E.
West side of 9A Street between 1 Avenue and 2 Avenue N.E.
Construction Impacts:
Relating to the detour and parking impacts here's what you can expect:
The temporary closure of various roadways. Traffic will be maintained during construction, by way of local detours.
Pedestrian and businesses access will remain open during construction, by way of detour signage, temporary walkways, and access ramps through work areas.
An increase in on-site construction activity, including construction crews, vehicles and heavy equipment, and an increase in noise and vibration.
The construction work hours for the Main Streets Program are Monday to Saturday from 7 a.m. to 10 p.m., and construction activity on weekends, weekdays, and overnight as required.
Thank you again for your patience throughout construction while we work to complete these improvements in the area.
For More Information:
For more information and regular updates on the Bridgeland Main Street project, or to sign up for our electronic newsletter, please visit calgary.ca/BridgelandMainStreet.
If you have any questions, please email our project team at bridgelandmainstreet@calgary.ca.